Go to content

CfR Visits HS2 At Curzon Street - Campaign For Rail

Skip menu
Skip menu
CfR Visits HS2 At Curzon Street
On 30 June, a group of Campaign for Rail members were welcomed by HS2 for a tour of the largest construction site in Europe.  The scale of the new Curzon Street station in Birmingham is awesome.  Already, the approach viaducts are built, three for double track and, the right hand one in the photo, is single track.  The design had this for the platform with Customs and Passport checking for through trains to Continental Europe.  Perhaps one day! (Meanwhile, next to it, a CrossCity service to Lichfield Train is passing).
The visit began with a well illustrated presentation from Louis.  HS2 has its own website, hs2.org.uk/building-the-railway.  There are some interesting videos on HS2’s YouTube channel too.  This part of our visit took much longer than anticipated as Louis allowed us to ask questions!  Then we put on the full PPE kit for a site tour.
The site is so big that walking routes, much of which is ‘carpeted’, includes pelican crossings.

The London and Birmingham Railway’s 1838 station building behind us is owned by Birmingham City Council and is not to be part of the new HS2 station.  It may become a restaurant or the entrance to a new hotel alongside the new station.
The world’s oldest railway roundhouse, built in 1837, was discovered when preparing the site and stone from it is being preserved.

The seven new platforms are to be at the height of the concrete beams.  Underneath will be busy, like St.  Pancras International, with escalators up.  The site, though, is so long that the land rises up to Moor Street and it will be escalators down to platform level at the buffer stop end.  The track from here, at the other end of the platforms, needs to rise over the CrossCity line, and this will include a stretch at 1 in 21!
The first beams are going in to create a route under the station for the West Midlands Metro extension to Digbeth, more or less along where New Canal Street used to be.  Tram track is already laid at the Digbeth end and as far as Millennium Point from Corporation Street/Bull Street.  When HS2 Curzon Street opens, a new tram stop will be here, under the platforms and the temporary Millennium Point stop will be removed.  In the background, centre left, the pink building is the Thinktank, the home of Stanier’s LMS Pacific 46235 City of Birmingham.
For those lucky enough to be part of the visit, it also gave a new perspective on the existing railway.  This is a train for Walsall, approaching Proof House Junction.  For those unable to come, I recommend a ride from New Street out to Duddeston.  Be sure to sit on the left hand side!
Latest News

11 March 2026

The opening dates for the five new West Midlands stations have been announced.  Full details and timetables may be read in the News and Comment section.

5 October 2023

The Prime Minister has "promised" investments in the Midlands rail network in the light of the decision to cancel HS2 phase 2.  Full details may be read in the News and Comment section.

29 November 2022

Campaign for Rail has responded to the WMRE Rail Investment Strategy consultation document.  The original consultation document and the CfR response may be read in the Consultations section.

13 July 2022

Major timetable changes will take place to services from London Euston to the West Coast Main Line from December 2022, with additional changes in the West Midlands area during 2023.  Full details may be read in the News and Comment section.

27 May 2022

Engineering Works affect Snow Hill line service from 20 to 23 June 2022.  Full details may be read in the News and Comment section.

27 August 2020

To find out first-hand how safe rail travel is post-Covid, four members of the CfR committee made a couple of rail journeys.  Their full report can be read in the News and Comment section.

1 July 2020

The Department for Transport has announced the 50 schemes that have been submitted in the second round of bids under the Restore Your Railways scheme.
Full details may be read in the News and Comment section.

7 June 2020

The new station building at Kidderminster has been opened.
Full details may be read in the News and Comment section.


23 May 2020

The 10 successful projects from the bids submitted in the first round under the Restore Your Railways scheme have been announced by the Secretary of State for Transport, Grant Shapps.
Full details may be read in the News and Comment section.
Last Updated on
9 July 2026
(News and Comment)
Campaign for Rail
Membership Secretary
19  Redwood Road
Kings Norton
Birmingham
B30 1AE
contact-us@campaignforrail.org.uk

Campaign for Rail
Membership Secretary
19 Redwood Road
Kings Norton
Birmingham
B30 1AE
contact-us@campaignforrail.org.uk

Skip menu
Back to content